What is the procedure for 2010ECL signal monitor ATSI test?

This article discusses the procedure for performing an EDI 2010ECL signal monitor ATSI test.

Procedure

  1. Download and install PCMT-8800 Test Manager software.
  2. Open PCMT-8800 Test Manager.
  3. Go to “Monitor Info” and enter signal monitor details.
  4. Go to "Test Setup" and set:
    1. Test Standard Caltrans = Model 2010
    2. Monitor Type = 18 Channel
    3. Test Type = Certification
    4. Test Laps = One
  5. Open MonitorKey software and set the following:
    1. Top dip switch: 1,4,6,7 “on”
      1. All others “off” —> RF 2010, GY ENABLE, LEDguard, RF

        SSM

    2. Middle dip switch: all “on” (SSM on for all channels)
    3. Bottom dip switch: all “on” (SSM on for all channels)
    4. WD Enable: “on”
  6. Insert “Regular Test Card” with all diodes soldered in.
  7. Start test.
    1. Make sure you reset monitor for five seconds after setting switches).
    2. Tester will “beep” when complete.