Procedure
- Download and install PCMT-8800 Test Manager software.
- Open PCMT-8800 Test Manager.
- Go to “Monitor Info” and enter signal monitor details.
- Go to "Test Setup" and set:
- Test Standard Caltrans = Model 2010
- Monitor Type = 18 Channel
- Test Type = Certification
- Test Laps = One
- Open MonitorKey software and set the following:
- Top dip switch: 1,4,6,7 “on”
All others “off” —> RF 2010, GY ENABLE, LEDguard, RF
SSM
- Middle dip switch: all “on” (SSM on for all channels)
- Bottom dip switch: all “on” (SSM on for all channels)
- WD Enable: “on”
- Top dip switch: 1,4,6,7 “on”
- Insert “Regular Test Card” with all diodes soldered in.
- Start test.
- Make sure you reset monitor for five seconds after setting switches).