What is the procedure for Reno 2018 signal monitor ATSI test?
This article discusses the procedure for performing a Reno 2018 signal monitor ATSI test.
Procedure
- Download and install PCMT-8800 Test Manager software.
- Open PCMT-8800 Test Manager.
- Go to “Monitor Info”.
- Enter Reno 2018 Monitor data into Monitor Info (serial number, etc.)
- Go to "Test Setup” and set:
- Test Standard Caltrans = Model 2010
- Monitor Type = 18 Channel
- Test Type = Certification
- Test Laps = One
- Open MonitorKey software and set the following:
- Option dip switch: 7 (2010) “on” (all others “off)
- DUAL ENABLE dip switch: all “on” (DUAL ENABLE on for all channels)
- RED FAIL dip switch: all “on” (SSM on for all channels)
- WD Enable: “on”
- Insert “Regular Test Card” with all diodes soldered in.
- Start test.
- Make sure you reset monitor for five seconds after setting switches).
- Tester will “beep” when complete.