What is the procedure for Reno 2018 signal monitor ATSI test?

This article discusses the procedure for performing a Reno 2018 signal monitor ATSI test.

Procedure

  1. Download and install PCMT-8800 Test Manager software.
  2. Open PCMT-8800 Test Manager.
  3. Go to “Monitor Info”.
  4. Enter Reno 2018 Monitor data into Monitor Info (serial number, etc.)
  5. Go to "Test Setup” and set:
    1. Test Standard Caltrans = Model 2010
    2. Monitor Type = 18 Channel
    3. Test Type = Certification
    4. Test Laps = One
  6. Open MonitorKey software and set the following:
    1. Option dip switch: 7 (2010) “on” (all others “off)
    2. DUAL ENABLE dip switch: all “on” (DUAL ENABLE on for all channels)
    3. RED FAIL dip switch: all “on” (SSM on for all channels)
    4. WD Enable: “on”
  7. Insert “Regular Test Card” with all diodes soldered in.
  8. Start test.
    1. Make sure you reset monitor for five seconds after setting switches).
    2. Tester will “beep” when complete.